筛选条件 共查询到4条结果
排序方式
A game theory model based on Gale-Shapley for dual-resource constrained (DRC) flexible job shop scheduling

期刊: INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020; 11 (2)

Most job shops in practice are constrained by both machine and labor availability. Worker assignment in these so-called Dual Resource Constrained (DRC......

The use of labour flexibility for output control in workload controlled flow shops: A simulation analysis

期刊: INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020; 11 (3)

Workload control theory seeks to align capacity and demand to improve delivery performance. However, workload control researchers mainly focused on in......

A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance

期刊: INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020; 11 (4)

This study develops a postponement model for the multi-item replenishment decision featuring commonality, an overtime strategy, and product quality re......

Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy

期刊: INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020; 11 (4)

This study explores the optimal fabrication runtime for a buyer-vendor incorporated system featuring repairable items, stochastic breakdown, accelerat......

共4条页码: 1/1页15条/页